Today the guys continued working on the rafters. The work here goes a little slower because everything must be cut and then hoisted up to roof level, then placed and nailed by some brave sole who is not afraid of heights (Augustine is our heights guy). The guys also worked on the bump out ceiling and framed in the vaulted ceiling in the Owners Suite Bath. They also completed removing the existing floor where the dining room attaches to the stair tower. Lastly the guys made about a million cuts to install the sofit block and vents to all existing roofs. This is also a slow and tedious task but must be done. O'Leary Cole also used a top secret venting material, I am including a photo but do not ask me their source for this material... I will never tell.
Saturday, July 25, 2009
Day - 41 More roof and Sofit Blocks
Today the guys continued working on the rafters. The work here goes a little slower because everything must be cut and then hoisted up to roof level, then placed and nailed by some brave sole who is not afraid of heights (Augustine is our heights guy). The guys also worked on the bump out ceiling and framed in the vaulted ceiling in the Owners Suite Bath. They also completed removing the existing floor where the dining room attaches to the stair tower. Lastly the guys made about a million cuts to install the sofit block and vents to all existing roofs. This is also a slow and tedious task but must be done. O'Leary Cole also used a top secret venting material, I am including a photo but do not ask me their source for this material... I will never tell.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment