The guys paused a bit today to prep the site for the work to be completed next week. All of the lumber is now out of the driveway and neatly stacked on the main level deck and all of the scrap is loaded into the dumpster. These guys move fast and keep the job site clean and neat. This is not an easy task because this site has had so much deconstruction/demolition.
Saturday, July 11, 2009
Day 26 - The Cleanup
The guys paused a bit today to prep the site for the work to be completed next week. All of the lumber is now out of the driveway and neatly stacked on the main level deck and all of the scrap is loaded into the dumpster. These guys move fast and keep the job site clean and neat. This is not an easy task because this site has had so much deconstruction/demolition.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment