Friday the inspectors were here checking out how the plumbing was going. Friday night I did a little hand planing and fixed the bathroom door that has been sticking since the big lift.
Saturday was quiet. Saturday afternoon I did climb into the attic and completed some work on a condensation drain from the upstairs air conditioner.
Sunday is always a rest day (unless something really really has to be done).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment