They built some really big block walls today. They removed several more support piers from the basement. They hit those support piers with sledge hammers so hard the whole house shook. They took apart a wall they built yesterday. The reason was that is was not exactly square. The wall was square it was just square with an out of square existing wall. Drain lines for lower level were run. Sewer lift station was installed. We also met with the designer and moved the downstairs kitchenette bar a few inches to make way for a larger refrigerator (wider). We were thinking it would be nice if when we buy a new refrigerator we could just move our existing fridge downstairs and we needed a few more inches to do so. All this is prep for and inspection and slab pour that should be done in the basement tomorrow.
Thursday, June 25, 2009
Day 11 - Tall walls no walls
They built some really big block walls today. They removed several more support piers from the basement. They hit those support piers with sledge hammers so hard the whole house shook. They took apart a wall they built yesterday. The reason was that is was not exactly square. The wall was square it was just square with an out of square existing wall. Drain lines for lower level were run. Sewer lift station was installed. We also met with the designer and moved the downstairs kitchenette bar a few inches to make way for a larger refrigerator (wider). We were thinking it would be nice if when we buy a new refrigerator we could just move our existing fridge downstairs and we needed a few more inches to do so. All this is prep for and inspection and slab pour that should be done in the basement tomorrow.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment